September 22, 2022

A Thickened Slab to Support Load-Bearing Walls 

In this episode of Site Visit with NS Builders, Mike Hume gives a quick tour and update of progress at our Needham project. And that unmistakable grin on his face? That’s the result of Mike finally getting his own jobsite trailer delivered!

A THICKENED BASEMENT SLAB 

The basement slab has been poured—including the built-in haunches that are in areas we needed to thicken up to support load-bearing walls. Everywhere there is a haunch, you’ll find #4 rebar that was bent through the haunch and then tied into a welded wire mesh. The result of this extra attention is that the load-bearing walls will now rest on a thickened 12-inch slab. 

The foundation is now prepped and ready for framing to begin.  

A HIDDEN GUTTER DRAINAGE SYSTEM

Now that the foundation is done, site work continues with backfilling around the foundation and preparing for the new driveway entrance. At one corner of the foundation, there is a green pipe above grade—this will be the drainage for the gutters. The gutter drainage system will take all the water from the roof and transport it far around to the back of the house and property where it will collect and disperse there. Keeping this basement dry has been a huge concern for the homeowner and this measure will go a long way in doing just that.  

It’s time to discover what NS Builders can intentionally design and build for you! Contact us today to get started on your custom dream home. Together, we can make it happen. 

—Nick Schiffer

Share:

More News

March 28, 2024

How To Make the Most Out of Your Home Rdenovation Wishlist

View More
March 28, 2024

Answering Your FAQs About Custom Home Building

View More
April 27, 2023

Quincy Cottage Renovation—New Windows, Roof and Upgraded Electrical Service

View More